www.黄色毛片 I 午夜剧场一级片 I 色婷婷中文 I 五级黄色片 I 日本精品一区二区在线观看 I 国产福利三区 I 午夜黄视频 I av无码av高潮av喷吹免费 I 98超碰在线 I 亚洲夜夜爱 I 嘿咻视频在线观看 I 天天爽夜夜爽视频精品 I 久久久久1 I 欧美一级片网址 I 色老二导航 I 久久久一区二区精品 I 你懂的91 I 亚洲乱码中文论理电影 I 国产黄色免费片 I 亚洲国产精品久久久久秋霞影院 I 99中文字幕 I 中文字幕四区 I 在线三级av I 青青草手机视频 I www.亚洲视频.com I 欧美日韩国产成人高清视频 I 国产精品爱久久久久久久电影 I 免费嗨片首页中文字幕 I 天天色综合4 I 日韩中文字幕免费在线观看 I 久久国产精品网站 I 在线免费观看福利影院 I 成人丁香在线 I 米奇777影视狠狠狠 I 色噜噜狠狠色综合欧洲selulu

News

current position:home page>News>

Mass Flowmeter | 10 Key Installation Points

1) Flowmeter Installation Location

The installation location is crucial. Generally, horizontal installation is recommended. In particular, flowmeters used for high-pressure applications (bypass instruments > 10 bar) must be installed horizontally. Avoid installing near mechanical vibrations and heat sources.

2) Avoiding Pipe Disturbances

Avoid sudden bends at the inlet and outlet of the flowmeter or any objects in the flow path that may cause turbulence, especially under high-flow conditions. It is recommended that the distance between the pipe bend and the inlet should be no less than 10 times the pipe diameter.

3) Nameplate

Please read the instrument nameplate before installation to check the electrical connections, flow range, medium to be measured, inlet and outlet pressures, operating temperature, ATEX category (if applicable), as well as input and output signals. Also, check whether the sealing material is compatible with the process gas.

4) Electrostatic Discharge

The flowmeter contains electronic components sensitive to electrostatic discharge (ESD) - the sudden flow of current between two charged objects caused by contact. Contact with charged persons or objects may endanger these components or even cause them to fail.

5) Pressurization

Do not pressurize the system before powering it on. When pressurizing the system, gradually increase the pressure to avoid pressure surges.

6) Pipeline Inspection

Ensure the system is clean (before installing the instrument). To ensure cleanliness, install a filter to ensure an oil- and water-free gas path. It is recommended to install a filter upstream of the flowmeter/controller, and a filter or check valve downstream in case of backflow.

7) In-line Installation

Install the mass flowmeter/controller in the pipeline, following the instructions to tighten the connections.

8) Pipe Diameter

Avoid using small-diameter pipes under high-flow conditions, as inlet jetting can affect accuracy and may cause excessive pressure drop in the pipes and connections. Selecting an appropriate pipe diameter is also important to minimize the impact of turbulence.

9) Leakage Test

Before pressurizing the system, be sure to check for leaks, especially when dealing with toxic, explosive, or other hazardous fluids.

10) Powering On

Power on the flowmeter/controller and allow it to preheat for approximately 30 minutes until it stabilizes. This can be done with or without fluid pressurization.

WeChat

Customer Service QQ

Customer Hotline:

010-52867770
0l0-52867771
l3811111452
l7896OO5796

Technical Supports

0l0-52867774
l7896OO5796
info@dorgean.com